20th May 2009

a work party to landscape the improved path beside Newlands Beck


we were working with students from Shepherds School in Nottingham


bringing barrowloads of turf with Catbells in the distance


another load looking north to Skiddaw


the turf is put in along the edge of the path to improve the look and prevent erosion


going back for another load


trying to drain the pathside water into Newlands Beck


intermittent showers and Skiddaw beyond is in mist


loading the turf into the barrows


back to work after lunch - the completed path edge on the right